Next

Previous

JSC Savushkin Product. Pinsk branch.

Energy Center based on 2 piston gas engine units 12V4000L33 produced by MTU Onsite Energy GmbH with exhaust gas steam boilers produced by Viessmann and absorption chiller BROAD (electric output 2.6 MW, total steam output 20 ton per hour at steam pressure 10 bar).

Scope of works:

- Technology project design

- Equipment delivery

- Installation supervision

- Engineering services

- Commissioning works